New Range of Thermobreak Pipe Insulation Approvals

February 26th, 2021|

In partnership with Sekisui Foam Australia, BOSS Fire has released an extensive range of firestopping systems for lagged steel, copper & iron & pipes using Thermobreak®  Tube Pipe Insulation.

Thermobreak®  Tube is a preformed closed cell physically crosslinked polyolefin foam [...]

Asia Pacific Fire Magazine – Scott Base Research Station

January 15th, 2021|

We recently had an article published in the Asia Pacific Fire Magazine about a unique project that we we’re involved with; The Scott Base Research Station in Antarctica.

Asia Pacific Fire is the only quarterly journal for the Asia Pacific [...]

  • Permalink Gallery

    PEX Pipes – 60 & 90min FRL – Single Layer Plasterboard Systems – No Build Up!

PEX Pipes – 60 & 90min FRL – Single Layer Plasterboard Systems – No Build Up!

November 25th, 2020|

Use BOSS FireMastic-HPE™ for 20mm PEX Water Pipes in single layer plasterboard systems without any need for localised build up or double sheeting above the door header!

FRL -/60/60  single layer plasterboard walls – Flush seal only 13mm deep!

FRL -/90/90 [...]

BOSS MaxiCollars™ – Only 30mm Thick

November 25th, 2020|

Did you know BOSS MaxiCollars™ are only 30mm Thick!
At only 30mm in depth, BOSS MaxiCollars™ offer a perfect solution for fire rating combustible pipe penetrations or A/C paircoil bundles in tight areas or when services run close to [...]

BOSS FIRE HAS THE HVAC/R INDUSTRY COVERED!

November 9th, 2020|

BOSS Fire® offers market leading passive fire solutions suitable for the HVAC/R industry. With a wide variety of solutions suitable for lagged copper pipes & A/C Paircoil bundles, BOSS Fire offers the ultimate fire stopping technology with our BOSS [...]

BOSS FyreBox – Now approved in concrete floor slabs!

November 11th, 2019|

The BOSS FyreBox is now approved in a wide variety of concrete floor slabs.

Starting at slabs as minimal as only 70mm thick, the BOSS FyreBox offers 60, 90 & 120min fire protection with the use of the BOSS P40-MAK [...]

Sprinkler Pipe System – No Wrap Required!

September 25th, 2019|

BOSS fire listen to customer feedback and develop systems that are easy to install, cost efficient and ensure compliance, every time.

Due to heat transfer of a steel pipe this size, in the past a more common solution would’ve required [...]

Flexing our Testing

September 24th, 2019|

BOSS has been busy fire testing lately with eight fire tests carried out in 2018 and a further twelve planned for 2019. Spreading our test program across several laboratories, including three fire tests this year at the impressive new [...]

BOSS Fire® Wins 4 year Government Passive Contract

September 24th, 2019|

2019 saw the start of an innovative NZ Govt contract, awarding passive product purchase separately from labour supply in a 4 year contract for the repair, refurbishment and construction of Passive Five Protection.

BOSS were chosen to supply Passive Fire [...]