Challenge Accepted!

May 6th, 2021|

Come and see us at The Association of Australian Certifiers (AAC) 2021 Annual Conference, Challenge Accepted.

BOSS Fire are a major sponsor and will be exhibiting and showcasing many new product approvals.

Registrations are now open!

Registered certifiers are on the [...]

NEW APPROVALS FOR METAL PIPES

March 31st, 2021|

We are extremely excited to announce our new range of certification relating to non-insulated steel, copper & iron pipes!

Market leading BOSS products related to the new systems include FireMastic-300™, P40-MAK Wrap™, BOSS Batts, FirePillows-240™, FireSilicone-EMA™, Thermal Defence Wrap and [...]

  • Permalink Gallery

    PEX Pipes – 60 & 90min FRL – Single Layer Plasterboard Systems – No Build Up!

PEX Pipes – 60 & 90min FRL – Single Layer Plasterboard Systems – No Build Up!

November 25th, 2020|

Use BOSS FireMastic-HPE™ for 20mm PEX Water Pipes in single layer plasterboard systems without any need for localised build up or double sheeting above the door header!

FRL -/60/60  single layer plasterboard walls – Flush seal only 13mm deep!

FRL -/90/90 [...]

BOSS MaxiCollars™ – Only 30mm Thick

November 25th, 2020|

Did you know BOSS MaxiCollars™ are only 30mm Thick!
At only 30mm in depth, BOSS MaxiCollars™ offer a perfect solution for fire rating combustible pipe penetrations or A/C paircoil bundles in tight areas or when services run close to [...]

BOSS FIRE HAS THE HVAC/R INDUSTRY COVERED!

November 9th, 2020|

BOSS Fire® offers market leading passive fire solutions suitable for the HVAC/R industry. With a wide variety of solutions suitable for lagged copper pipes & A/C Paircoil bundles, BOSS Fire offers the ultimate fire stopping technology with our BOSS [...]

Future Proofing Passive Fire at Scott Base Antarctica

April 23rd, 2020|

High value properties – such as scientific research centres – always require careful planning to design the most effective fire safety protection systems. But when that property is 3,000kms away from the civilisation in one the harshest climates on [...]

New Range of Comflor® Systems Available

April 9th, 2020|

Driven by customer demand, BOSS has developed a new range of passive systems for Comflor® steel decking floor slabs. Now approved for up to 120 minutes fire resistance, BOSS’s leading penetration seals now protect pipes, cables and bundled services [...]

Premier Tower – Multiplex

March 27th, 2020|

Project: Premier Tower

Builder: Multiplex

Architect: Elenberg Fraser

Location: 134-160 Spencer Street, Melbourne, Victoria, Australia

The 79-storey Premier Tower is situated in the heart of Melbourne’s inner city. Designed by architects Elenberg Fraser, it’s design features a distinctive wave-like curve design and will comprise a mixture [...]

COVID-19 Update

March 25th, 2020|

25th March 2020

We would like to update you on the actions we are taking as a business to support & protect our customers, suppliers, business partners, employees and wider community during the COVID-19 outbreak.

From the beginning of the outbreak [...]

New Range of 60min & 90min Ceiling Systems Available

March 23rd, 2020|

Driven by customer demand, BOSS has developed a new range of passive systems for Fire Rated Ceilings.

Now approved for 60min and 90min fire resistance, BOSS’s leading penetration seals now protect pipes, cables and bundled services in 2 x layer [...]