Driven by customer demand, BOSS has developed a new range of passive systems for Comflor® steel decking floor slabs. Now approved for up to 120 minutes fire resistance, BOSS’s leading penetration seals now protect pipes, cables and bundled services in very thin trapezoidal floor slabs.
Tested systems in Comflor® include these leading BOSS products:
- FireMastic-HPE™ intumescent sealant
- MaxiCollars™ for pipes and cables
- BOSS FyreBox™
- FireMastic-300™ 5hr fire rated sealant
- BOSS Batt
Service Penetrations | Primary Fire Stopping Protection | FRL | Certification Reference | ||
Plumbing: | |||||
100mm uPVC DWV Pipe | MaxiCollar™ 100mm | -/120/120 | SFC FRT180137a.2 | ||
75mm HDPE Pipe | MaxiCollar™ 75mm | -/120/120 | SFC FRT180137b.2 | ||
32mm Copper Pipe | FireMastic-300™ | -/120/30 | SFC FRT180137d.2 | ||
Pipes in various combo’s & qty’s: – Up to 32mm PEX Pipe – Up to 32mm PEX AL Pipe – Up to 32mm Lagged Copper – Up to 32 uPVC – Up to 60mm Steel Sprinkler Pipe – Up to 25mm Uninsulated Copper |
BOSS FyreBox | up to -/120/120 | FC12925 | ||
Electrical: | |||||
50mm Bundle of 22 x TPS Cables | FireMastic-HPE™ | -/120/120 | SFC FRT180137b.2 | ||
25mm uPVC Conduit | MaxiCollar™ 32mm | -/120/120 | SFC FRT180137a.2 | ||
Cables in various combo’s & qty’s: – Up to 32mm uPVC Conduits – TPS, Power & Mains Cables – Comms & Data Cables: – CAT6, CAT5E – COAX Cables – Fire Alarm & Security – Intercom & EWIS – A/C Control & Figure 8 |
BOSS FyreBox | up to -/120/120 | FC12925 | ||
Multi-Service Bundles & HVAC+R: | |||||
Paircoil – A/C Lagged Copper Pipes 25mm uPVC |
FireMastic-HPE™ | -/120/120 | SFC FRT180137b.2 | ||
Pipes in various combo’s & qty’s: – Paircoil – A/C Lagged Copper Pipes – up to 32mm Copper with 19mm Lagging – up to 25 Copper with 13mm Lagging |
BOSS FyreBox | up to -/120/120 | FC12925 |
Technical Bulletin
Each project and/or application may have specific requirements and you should investigate these carefully. Ensure that you have read and understood the appropriate certification relative to your needs, and ensure you seek acceptance from the Certifying Authority or compliance inspector before installation. For updates of BOSS’ certification please contact BOSS Technical Services on +61 2 9531 8591.
Recent Comments